ERP for Pipe & Tube Manufacturers

ERP for pipe manufacturers:resin or coil in, tested pipe bundles out

Pothera ERP manages plastic and steel pipe plants on one system. Resin, compound and coils are tracked by batch, heat or lot; extrusion lines or tube mills are recorded stage by stage; weight and length are calculated automatically; hydro and dimensional tests are stored with each batch; and bundles leave with gate passes, truck loading and GST e-invoices.

Demo on your own process · Live in 8–12 weeks · Cloud or on-premise

How are pipes manufactured?

Plastic pipes (PVC, CPVC, HDPE) are made by mixing resin with additives, extruding it through a die, sizing and cooling it, printing marking, cutting to length, socketing or belling, testing and bundling. Steel ERW pipes start from coils that are slit, formed and welded, sized, cut, tested (often hydrostatically), galvanised for GI pipes, threaded and bundled.

  • PVC, CPVC and UPVC pipe and fittings makers
  • HDPE and MDPE pipe and coil manufacturers
  • ERW, GI and MS pipe and tube mills
  • Pipe traders and distributors with multiple godowns
Challenges we solve

The problems pipes & tubes businesses bring to us

Six situations we hear most often — and how Pothera handles each one.

Weight vs length confusion

Material is bought by weight, made by metre and sold by length or bundle; stock never reconciles.

With PotheraAutomatic weight calculations and stock tracked by batch; item attributes for size, class and length.

Inventory, Production

Resin and coil price volatility

Margins swing with PVC resin or HR coil prices.

With PotheraQuotation comparison, landed cost and perpetual inventory costing show real cost per tonne.

Purchase, Accounts

No coil-to-pipe traceability

A failed pipe cannot be traced to the coil or resin lot.

With PotheraBatch, heat and lot tracking from receipt through every production stage.

Inventory, Production

Scrap and regrind

Start-up scrap, cut ends and regrind are not measured.

With PotheraScrap items and production loss defined per BOM; re-processing as its own order.

Production

Test records

Hydro and dimensional tests are on paper, not linked to batches.

With PotheraFG inspection parameters (pressure, OD, wall thickness) stored per batch.

Quality

Heavy dispatch

Truck loading, gate passes and bundles slow down despatch.

With PotheraGate pass, truck loading and dispatch coordination with deliveries and e-invoices.

Sales & Distribution
Recognise two or more of these?A 20-minute call is enough to see whether Pothera fits your business.
How it works

The pipes & tubes process, step by step in Pothera

What happens on the floor at each step, what Pothera records, and the document it creates.

  1. 1

    Resin / coil receipt

    On the floor
    PVC/HDPE resin and additives, or HR coils, arrive and are weighed.
    In Pothera
    GRN with batch, heat or lot; inward inspection.
    GRN, inspection
  2. 2

    Compounding / slitting

    On the floor
    Resin is blended with stabilisers and fillers; coils are slit to strip width.
    In Pothera
    Production order with BOM; scrap defined.
    Production order
  3. 3

    Extrusion / forming & welding

    On the floor
    Material is extruded through a die, or strip is formed and ERW-welded.
    In Pothera
    Stage entry with line/machine and operator.
    Stage entry
  4. 4

    Sizing, cooling & cutting

    On the floor
    Pipe is sized, cooled, marked and cut to length.
    In Pothera
    Stage entry; output by length and weight; cut-end scrap.
    Stage entry
  5. 5

    Socketing / threading / galvanising

    On the floor
    Belling or socketing for plastic; threading and galvanising (often job work) for GI.
    In Pothera
    In-house stages or job work challans.
    Stage entry or job work
  6. 6

    Testing

    On the floor
    Hydrostatic pressure, OD and wall thickness, visual checks.
    In Pothera
    FG inspection parameters per batch; release or hold.
    FG inspection
  7. 7

    Bundling & labelling

    On the floor
    Pipes are bundled by size and class with batch-marked labels.
    In Pothera
    FG receipt by batch with barcode labels.
    FG receipt
  8. 8

    Loading & dispatch

    On the floor
    Bundles loaded to trucks for dealers and projects.
    In Pothera
    Gate pass, truck loading, deliveries, e-invoices.
    Delivery, e-invoice
Key features

Everything a pipes & tubes business needs, on one platform

Pick an area to see what it covers.

Production

  • Multi-level BOM with scrap and loss
  • User-defined stages for extrusion or mill
  • Batch/serial numbers
  • Re-processing

Inventory

  • Batch, heat and lot tracking
  • Automatic weight calculations
  • Multi-location
  • Barcode

Quality

  • Inward, WIP and FG inspection
  • Pressure and dimensional parameters
  • Rejection analysis

Purchase

  • MRP indents
  • Quotation comparison
  • Import landed cost

Job work

  • Galvanising, threading or coating sent out on challans and reconciled

Dispatch & finance

  • Gate pass, truck loading, deliveries
  • GST e-invoicing
  • Dealer receivables
Compliance

Compliance built into daily work

  • GST e-invoicing integrated through API.
  • Batch-linked test records support customer, project and third-party inspection.
Reports you will use

KPIs on your dashboard from week one

  • Output by line/mill and shift
  • Scrap and regrind percentage
  • Weight variance vs standard
  • Test rejections by reason
  • Dispatch by truck, dealer and region
Before and after

What changes when you move to Pothera

Spreadsheets / accounting software With Pothera ERP
Stock by weight and length Two sheets that disagree Weight calculated from length and size
Coil / resin trace Not possible Batch, heat and lot from receipt to bundle
Scrap Estimated Recorded per order
Test records Register Stored per batch
Dispatch Manual gate passes Gate pass and truck loading in the system
From our implementation team

Set weight per metre as the standard, then measure the variance

In pipe plants, profit hides in a few grams per metre. Define the standard weight per metre for every size and class, record actual output by weight and length, and review the variance weekly by line. It is the most direct lever on resin and steel cost.

Implementation

Go live in 8–12 weeks

A fixed six-phase plan for 10 to 100 users, configured for pipes & tubes.

  1. Weeks 1–2Discover

    Plant walk-through, scope and success measures.

  2. Weeks 2–4Design

    Masters, BOMs, routings and approval rules.

  3. Weeks 3–6Configure

    Workflows, formats, reports and dashboards.

  4. Weeks 5–8Migrate

    Stock, balances and open orders reconciled.

  5. Weeks 7–10Train & test

    Role-wise training, UAT and parallel run.

  6. Weeks 9–12Go live

    Cut-over, hypercare and first month-end close.

What we configure for your pipes & tubes business

  • Sizes, pressure classes and lengths as item attributes
  • Weight per metre and conversion rules
  • Lines or mills and production stages
  • Test parameters per product
  • Bundle sizes, gate pass and truck-loading flow
Plan your go-live dateGet a written 12-week plan with scope, milestones and a cost basis.

Trusted by businesses like yours

Customer proof

Shri Tirupati Enterprises (continuous casting copper rods)

A metal-processing plant running sales, procurement, inventory and production on Pothera. The case study reports better order tracking, reduced manual errors and real-time data for decisions.

Read the case study

“Today I can recommend pothera to all as a true partner who can provide not just a software but complete solution to your challenges.”

Shiva Shakti Murugun · Vice President, Sterling
FAQ

Questions about ERP for pipes & tubes

What is the best ERP for pipe manufacturing?

Look for batch, heat and lot traceability from resin or coil, production by line or mill, weight-length control, scrap tracking, test records and heavy dispatch. Pothera covers each of these for plastic and steel pipe plants.

What is the PVC pipe manufacturing process?

Resin is mixed with stabilisers, fillers and pigments, extruded through a die, sized and cooled, printed, cut to length, socketed and tested before bundling.

How are ERW pipes made?

Steel coil is slit into strips, formed into a tube and joined by electric resistance welding, then sized, cut, tested, and for GI pipes galvanised and threaded.

What raw materials are used in PVC pipe manufacturing?

PVC resin plus stabilisers, lubricants, fillers such as calcium carbonate, and pigments. Pothera tracks each by batch at receipt.

Can Pothera track stock by both weight and length?

Yes. Pothera automates weight calculations, so stock and production can be seen by weight and by length for each size.

Can Pothera trace a pipe back to the coil or resin batch?

Yes. Batch, heat and lot numbers are carried from goods receipt through production stages to the finished bundle.

How does Pothera handle scrap and regrind?

Scrap items and production loss are defined on the BOM, actual scrap is recorded per order, and regrind can be re-processed as its own order.

Can galvanising be done through job workers?

Yes. Pipes sent for galvanising, threading or coating go out on job work challans and are reconciled when they return.

Does Pothera manage truck loading and gate passes?

Yes. Dispatch coordination includes gate pass management, truck loading and delivery scheduling.

How long does implementation take for a pipe plant?

Typically 8–12 weeks, depending on the number of lines or mills, sizes and classes, and locations.

See Pothera running your pipes & tubes process

Tell us about your business. A Pothera consultant will set up a demo on your own products and flow.

  • A demo of your own process, not a generic tour
  • A written scope, 12-week plan and cost basis
  • No obligation

Prefer to talk? · WhatsApp