FAQ
Questions about ERP for pumps
What is the best ERP for pump manufacturers?
One that handles castings and outside machining as job work, multi-level BOMs for many
models, serial numbers with test records, warranty and spares, and dealer sales. Pothera
covers each of these in one system.
What is the pump manufacturing process flow?
Procure castings and bought-outs, machine and balance components (in-house or through job
workers), build sub-assemblies, assemble, test performance, paint and pack, then dispatch
with a serial number and warranty.
How does Pothera track castings sent for machining?
Through the Job Work module: castings go out on challans, processed parts come back against
the same order, scrap is recorded and consumption is reconciled against standard, with
alerts for overdue material.
Can Pothera record pump performance tests?
Yes. Flow, head, power, efficiency and leakage can be set as FG inspection parameters, and
results are recorded against each pump’s serial number.
What is a pump performance test?
It measures how a pump actually performs (flow, head, power input and efficiency) against
its rated curve before dispatch. Recording it per serial number creates evidence for
customers and warranty.
Can Pothera manage warranty and spares?
Yes. Pothera includes warranty and service management, complaint tickets, AMC/CMC contracts,
preventive maintenance and spares tracking.
How does Pothera handle many pump models and variants?
Each model has its own multi-level BOM with substitute items, and BOM revisions handle
engineering changes without losing history.
Can Pothera plan for seasonal demand?
Yes. MRP raises indents from orders, forecasts, stock in hand and reorder levels, so
castings and motors are ordered before the peak.
Does Pothera support dealer schemes and targets?
Yes. Sales supports schemes, discounts, loyalty and target-vs-actual by dealer or region,
with receivables ageing in Accounts.
How long does a Pothera implementation take for a pump plant?
Typically 8–12 weeks for 10–100 users, depending on the number of models, job workers and
plants.