Demand planning
Confirmed sales orders, forecasts or production plans used as inputs to calculate material requirements by date.
Pothera MRP tells production and procurement teams what materials are needed, how much to buy or make, and when. It uses sales orders, forecasts and production plans with multi-level BOMs to calculate requirements, checks stock and scheduled receipts, works back from lead times and suggests purchase requisitions and production orders for planners to review.
Part of one connected ERP · Cloud or on-premise · Live in 8–12 weeks
Material Requirement Planning (MRP) is the planning engine inside an ERP. It takes demand (orders, forecasts, production plans), explodes the bill of materials into components, subtracts usable stock and scheduled receipts to find net shortages, and uses lead times to recommend when to release each purchase or production order. ERP then executes and records those orders across purchase, inventory, production and accounts.
Objective of the module: To help teams release purchase and production orders on time while avoiding unnecessary inventory, by calculating net requirements from demand, BOMs, stock and lead times.
Each step creates the document the next step needs, so every number traces back to its source.
Confirmed sales orders, forecasts or production plans by date.
DemandFinished goods broken into sub-assemblies, components and raw materials at every level.
Gross requirementUsable stock, reservations and open purchase and production orders reviewed.
SupplyShortfall by item and date after supply and safety stock.
Net requirementOrder release dates worked back from need dates.
Planned ordersPurchase requisitions and production orders suggested with practical quantities.
PR, production orderShortage alerts; orders expedited, deferred or cancelled as demand changes.
Exception report9 capabilities, all working on the same data as the rest of Pothera ERP.
Confirmed sales orders, forecasts or production plans used as inputs to calculate material requirements by date.
Finished goods broken down into sub-assemblies, components and raw materials with quantities at each BOM level.
Usable stock, existing reservations and scheduled receipts from open purchase and production orders reviewed before shortages are calculated.
Shortfalls by item and required date after available supply and configured safety stock.
Works backward from the material need date using supplier and production lead times to suggest release dates.
Minimum order quantities, order multiples or batch sizes applied to give practical purchase and production quantities.
Purchase requisitions for bought-out items and planned production orders for in-house items, reviewed by planners before release.
Projected shortages and late receipts flagged; orders to expedite, defer or cancel identified when demand or supply changes.
Gross requirements, available supply, net shortages and planned orders by item and date.
No re-typing between departments: data entered once is used everywhere.
MRP is only as good as your BOM and lead times
Incorrect BOMs, stock counts or lead times produce incorrect recommendations. Before your first MRP run, verify BOMs for your top products, record realistic supplier lead times and count the critical items. Most “MRP doesn’t work” complaints trace back to these three inputs.
Built and implemented by Bsquare since 1999. Add a client story for the MRP module with one verified number.
“Earlier we were using multiple applications to manage our business, now we have been able to manage our business operations quite seamlessly with pothera software as service ERP solution.”
Raghav Malik · Managing Director, Power Parts
MRP is the material-planning engine in an ERP. It calculates what to buy or make, how much and when, from demand, bills of materials, stock and lead times.
MRP plans materials for production. ERP runs the whole business — sales, purchase, inventory, production, quality, HR and accounts — and includes MRP as one module. Pothera includes MRP within the ERP.
Net requirement = gross requirement − usable stock − scheduled receipts + safety stock (and existing reservations). For example, if 1,000 pumps need 2 seals each (2,000), and 400 seals are free with none on order, the net requirement is 1,600 seals.
BOM explosion breaks a finished product into its sub-assemblies, components and raw materials at every level and multiplies quantities, giving the total requirement of each item.
An MRP run is the calculation that compares demand with supply and produces suggested purchase requisitions and production orders, plus shortage and reschedule alerts.
It works backwards from the date material is needed using supplier and production lead times, so orders are released early enough to arrive on time.
Yes. Minimum order quantities, order multiples and batch sizes are applied so suggestions are practical to order or produce.
Yes. Even a small plant with dozens of components per product saves time and avoids stoppages when shortages are flagged before production starts.
Tell us about your business. A Pothera consultant will set up a demo on your own products and flow.