Pothera ERP module · Material Requirement Planning (MRP)

Material Requirement Planning:know what to buy, make and when

Pothera MRP tells production and procurement teams what materials are needed, how much to buy or make, and when. It uses sales orders, forecasts and production plans with multi-level BOMs to calculate requirements, checks stock and scheduled receipts, works back from lead times and suggests purchase requisitions and production orders for planners to review.

Part of one connected ERP · Cloud or on-premise · Live in 8–12 weeks

What is MRP in ERP?

Material Requirement Planning (MRP) is the planning engine inside an ERP. It takes demand (orders, forecasts, production plans), explodes the bill of materials into components, subtracts usable stock and scheduled receipts to find net shortages, and uses lead times to recommend when to release each purchase or production order. ERP then executes and records those orders across purchase, inventory, production and accounts.

Objective of the module: To help teams release purchase and production orders on time while avoiding unnecessary inventory, by calculating net requirements from demand, BOMs, stock and lead times.

Expected business outcomes

What changes when you run MRP on Pothera

Fewer material shortagesIdentify supply gaps early
Timely procurementRelease purchase orders on time
Lower inventory costsReduce excess stock
Production continuityFewer material-related stoppages
Less emergency buyingFewer rush orders and freight costs
Process flow

How the MRP process works in Pothera

Each step creates the document the next step needs, so every number traces back to its source.

  1. 1Collect demand

    Confirmed sales orders, forecasts or production plans by date.

    Demand
  2. 2Explode the BOM

    Finished goods broken into sub-assemblies, components and raw materials at every level.

    Gross requirement
  3. 3Check stock and supply

    Usable stock, reservations and open purchase and production orders reviewed.

    Supply
  4. 4Calculate net requirement

    Shortfall by item and date after supply and safety stock.

    Net requirement
  5. 5Schedule by lead time

    Order release dates worked back from need dates.

    Planned orders
  6. 6Recommend orders

    Purchase requisitions and production orders suggested with practical quantities.

    PR, production order
  7. 7Review and re-plan

    Shortage alerts; orders expedited, deferred or cancelled as demand changes.

    Exception report
See this flow on your own dataA Pothera consultant will walk your process through the module in a live demo.
Book a process demoWhatsApp an advisor
Features and functionalities

Everything in the Material Requirement Planning (MRP) module

9 capabilities, all working on the same data as the rest of Pothera ERP.

1

Demand planning

Confirmed sales orders, forecasts or production plans used as inputs to calculate material requirements by date.

2

Multi-level BOM explosion

Finished goods broken down into sub-assemblies, components and raw materials with quantities at each BOM level.

3

Stock & supply check

Usable stock, existing reservations and scheduled receipts from open purchase and production orders reviewed before shortages are calculated.

4

Net requirement calculation

Shortfalls by item and required date after available supply and configured safety stock.

5

Lead-time scheduling

Works backward from the material need date using supplier and production lead times to suggest release dates.

6

Order quantity planning

Minimum order quantities, order multiples or batch sizes applied to give practical purchase and production quantities.

7

Purchase & production recommendations

Purchase requisitions for bought-out items and planned production orders for in-house items, reviewed by planners before release.

8

Shortage alerts & rescheduling

Projected shortages and late receipts flagged; orders to expedite, defer or cancel identified when demand or supply changes.

9

Material planning reports

Gross requirements, available supply, net shortages and planned orders by item and date.

Who it is for

Built for teams like yours

  • Make-to-order and make-to-stock manufacturers
  • Planners juggling many components per product
  • Plants that stop for missing material
  • Businesses with imported or long-lead-time items
Reports you will use

KPIs on your dashboard

  • Projected shortages by date
  • Planned orders awaiting release
  • Late receipts affecting production
  • Excess stock vs requirement
  • Rush purchases per month
From our implementation team

MRP is only as good as your BOM and lead times

Incorrect BOMs, stock counts or lead times produce incorrect recommendations. Before your first MRP run, verify BOMs for your top products, record realistic supplier lead times and count the critical items. Most “MRP doesn’t work” complaints trace back to these three inputs.

Trusted by manufacturers across India

Customer proof

Manufacturers across India run on Pothera

Built and implemented by Bsquare since 1999. Add a client story for the MRP module with one verified number.

Read customer stories

“Earlier we were using multiple applications to manage our business, now we have been able to manage our business operations quite seamlessly with pothera software as service ERP solution.”

Raghav Malik · Managing Director, Power Parts
Go live in 8–12 weeksA fixed six-phase plan: discover, design, configure, migrate, train and test, go live.
Get my implementation planCall +91-120-4757575
FAQ

Questions people ask about MRP in ERP

What is MRP in ERP?

MRP is the material-planning engine in an ERP. It calculates what to buy or make, how much and when, from demand, bills of materials, stock and lead times.

What is the difference between MRP and ERP?

MRP plans materials for production. ERP runs the whole business — sales, purchase, inventory, production, quality, HR and accounts — and includes MRP as one module. Pothera includes MRP within the ERP.

How is net requirement calculated in MRP?

Net requirement = gross requirement − usable stock − scheduled receipts + safety stock (and existing reservations). For example, if 1,000 pumps need 2 seals each (2,000), and 400 seals are free with none on order, the net requirement is 1,600 seals.

What is BOM explosion?

BOM explosion breaks a finished product into its sub-assemblies, components and raw materials at every level and multiplies quantities, giving the total requirement of each item.

What is an MRP run?

An MRP run is the calculation that compares demand with supply and produces suggested purchase requisitions and production orders, plus shortage and reschedule alerts.

How does MRP use lead times?

It works backwards from the date material is needed using supplier and production lead times, so orders are released early enough to arrive on time.

Can MRP handle minimum order quantities?

Yes. Minimum order quantities, order multiples and batch sizes are applied so suggestions are practical to order or produce.

Is MRP useful for small manufacturers?

Yes. Even a small plant with dozens of components per product saves time and avoids stoppages when shortages are flagged before production starts.

See the MRP module running your process

Tell us about your business. A Pothera consultant will set up a demo on your own products and flow.

  • A demo of your own process, not a generic tour
  • A written scope, 12-week plan and cost basis
  • No obligation

Prefer to talk? · WhatsApp